|
| R ' 0 5 S E S S I O N S T R U C T U R E | |||||||
| Symposium Hall | |||||||
| Room1 | Room2 | Room3 | Room4 | Rooom5 | Room6 | ||
| September 25, 2006 |
A.M. | R e g i s t r a t i o n | |||||
| P.M. | Opening Session / Plenary Lectures / Poster Session | ||||||
| W e l c o m e C o c k t a i l | |||||||
| (J u y i n g M e e t i n g H a l l) | |||||||
| September 26, 2005 |
A.M. | E-1 | J-1 | H-1 | O-1 | A-1 | C-1 |
| P.M. | E-2 | J-2 | H-2 | O-2 | N-1 | K-1 | |
| September 27, 2005 |
A.M. | M-1 | G-1 | L-1 | B-1 | N-2 | F-1 |
| P.M. | T e c h n i c a l T o u r | ||||||
| September 28, 2005 |
A.M. | M-2 | G-2 | L-2 | I-1 | N-3 | D-1 |
| P.M. | Workshops/ Closing Session | ||||||
| Evening | C o n g r e s s B a n q u e t | ||||||
| Sessions | |
| Fundamentals | |
| A) | Experiments |
| B) | Theory and Modelling |
| Resources | |
| C) | Utilization of Fossil, Mineral and Re-generable Resources |
| Energy | |
| D) | Technology (gas, coal and oil) |
| E) | New Energy, Renewable Energy and Biomass |
| Materials / Products | |
| F) | Cars and Electronic Products Recycling |
| G) | Building Materials and Waste Recycling |
| H) | Recovery and Re-use of Residues and Water |
| Process for Recycling | |
| I) | Mechanical, Thermal and Metallurgical Processing |
| J) | Green Chemistry and Green Processes |
| K) | Biological Process Engineering |
| L) | Environmental Technology |
| Socio-Economic Issues | |
| M) | Process System Integration |
| N) | Socio-Economic Issues |
| O) | National and Regional Topics |
© By Institute of Process Engineering, Chinese Academy of Sciences |